Implementation of Research and Developmental Works
Our employees qualification allows us to carry out research and development works for creating perspective and promising systems, complexes and means of communication for Customers’ benefit.
Specifics
A special feature of our work is its focus on ensuring the security of information exchange and resistance to external influences.
The customer receives:
- Pre-project specification for implementation
- R&D with justification of the choice rationality of engineering solutions
- Technical and system projects of developed products
- Detailed design (project) documentation and prototypes of the products being developed, as well as the results of their tests for compliance with the requirements
Duration
The duration of R&D is from one to two years, and OCD - from two to three years.
Examples of completed work (business cases)
R&D to create an integrated network of specialized communication:
- The total number of objects on which work on the deployment and upgrading of communication centers was performed - 58.
- All created communication centers were united into a single information and telecommunication network of the department.
R&D on the creation of complexes of technical means for processing, exchanging, displaying and documenting information from a single data bank on countering terrorism:
- The total number of objects where work on the deployment was performed of -30.
- All communications centers created were united into a single information and telecommunications network of the department and the NAC of the RF.
R&D for the creation and development of information and telecommunication infrastructure for a specialized communication network in the framework of the preparation and holding of the XXII Olympic Winter Games and XI Paralympic Winter Games in the city of Sochi in 2014:
- The total number of objects where work on the deployment and upgrading of communication centers (excluding TETRA standard mobile telecommunications network facilities) was done - 135. This number includes 11 major specialized communication nodes and 35 access nodes were upgraded at the Office facilities. At 89 sites, access nodes have been rebuilt, including 61 civilian objects. 28 fixed reference points and 2 switching and control centers of the operational mobile radio network were created.
- All created and modernized communication centers were combined into a single information and telecommunication structure with a single plan for IP addressing and telephone numbering.
- A10 Gbps backbone dedicated transport network was configured between the main control centers. Specialized dedicated channels with guaranteed traffic transmission were set up in the network for individual information systems (video information, access to databases, etc.).
R&D for the development of an integrated network of specialized communication:
- The total number of objects on which work on the deployment and upgrading of communication centers (excluding the TETRA standard mobile telecommunications network facilities) was carried out - 66.
- Created 14 fixed reference points and 1 switching and control center for the operational mobile radio network.
R&D for the establishment of operational mobile radio network:
- Samples of 6 fixed connection points and 1 switching center and control of the operational mobile radio network were created.